Skip to content

main -> 0.0.9#14

Merged
mutherr merged 11 commits into0.0.9from
main
Sep 30, 2025
Merged

main -> 0.0.9#14
mutherr merged 11 commits into0.0.9from
main

Conversation

@mutherr
Copy link
Contributor

@mutherr mutherr commented Sep 30, 2025

Change Summary

Related issue number

PR Type

  • Feature
  • Bugfix
  • Refactor/optimization
  • Test Coverage
  • Documentation
  • Revert
  • Release

Engineer Checklist

  • The PR title is clear and descriptive.
  • Satisfied all pre-commit hooks locally, manually tested the changes and investigated potential regressions.
  • Have checked files to be committed to ensure no sensitive information or unwanted files are included.
  • Added or modified tests that cover the codebase changes made in this diff.
  • All automated checks and tests pass during CI.
  • Documentation and code comments have been added (where applicable).
  • Any hacks or questionable design decisions have been highlighted in the code and in the PR.
  • Does the PR require any infrastructure changes before deployment? Detail them below if so.
  • Are there any other outstanding blockers or pre-requisites that must be satisfied elsewhere in order for this work to be released?
  • If this is a feature PR, add this PR to the summary of the Dev -> Prod PR or open that PR if necessary. This helps us track the contents of production deploys.
  • Are there any other required post-deployment actions? If so, detail them below AND on a develop to main PR.

Infrastructure Changes (Optional)

Blockers (Optional)

Post Deployment Actions (Optional)

@mutherr mutherr changed the title main -> 9/0/0 main -> 0.0.9 Sep 30, 2025
@mutherr mutherr merged commit 9cb56a8 into 0.0.9 Sep 30, 2025
1 check passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants