[GCU] Adding namespace in config interface command for multi-asic support#20448
Merged
arlakshm merged 1 commit intosonic-net:masterfrom Oct 28, 2025
Merged
Conversation
Collaborator
|
/azp run |
|
Azure Pipelines successfully started running 1 pipeline(s). |
Contributor
|
/Azpw run |
Collaborator
|
/AzurePipelines run |
|
Azure Pipelines successfully started running 1 pipeline(s). |
Contributor
|
Hi @okaravasi, could you take a look at the CI failures? |
Contributor
Author
Hi @LinJin23 Pipeline failures are not related with PR changes. It fails in "Prepare sonic-mgmt docker container" step. Please try to re-run them, I don't have access to do that. |
Contributor
|
/Azpw run |
Collaborator
|
/AzurePipelines run |
|
Azure Pipelines will not run the associated pipelines, because the pull request was updated after the run command was issued. Review the pull request again and issue a new run command. |
Javier-Tan
approved these changes
Oct 13, 2025
Contributor
Javier-Tan
left a comment
There was a problem hiding this comment.
Had the same solution in store for this, LGTM
Contributor
|
/Azpw run |
Collaborator
|
/AzurePipelines run |
|
Azure Pipelines successfully started running 1 pipeline(s). |
arlakshm
approved these changes
Oct 14, 2025
Contributor
|
The code changes look fine to me. but since this test is already skipped in #20542, why is this update still needed? |
Contributor
|
/Azpw run |
Collaborator
|
/AzurePipelines run |
|
Azure Pipelines successfully started running 1 pipeline(s). |
Contributor
LinJin23
approved these changes
Oct 28, 2025
arlakshm
approved these changes
Oct 28, 2025
dcaugher
pushed a commit
to dcaugher/sonic-mgmt
that referenced
this pull request
Nov 12, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
dcaugher
pushed a commit
to dcaugher/sonic-mgmt
that referenced
this pull request
Nov 12, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
vikumarks
pushed a commit
to vikumarks/sonic-mgmt
that referenced
this pull request
Dec 1, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: vikumarks <[email protected]>
albertovillarreal-keys
pushed a commit
to albertovillarreal-keys/sonic-mgmt
that referenced
this pull request
Dec 2, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Alberto Villarreal <[email protected]>
opcoder0
pushed a commit
to opcoder0/sonic-mgmt
that referenced
this pull request
Dec 8, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: opcoder0 <[email protected]>
selldinesh
pushed a commit
to selldinesh/sonic-mgmt
that referenced
this pull request
Dec 11, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: selldinesh <[email protected]>
echuawu
pushed a commit
to echuawu/sonic-mgmt
that referenced
this pull request
Dec 12, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
saravanan-nexthop
pushed a commit
to saravanan-nexthop/sonic-mgmt
that referenced
this pull request
Dec 15, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Saravanan <[email protected]>
gshemesh2
pushed a commit
to gshemesh2/sonic-mgmt
that referenced
this pull request
Dec 16, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Guy Shemesh <[email protected]>
AharonMalkin
pushed a commit
to AharonMalkin/sonic-mgmt
that referenced
this pull request
Dec 16, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Aharon Malkin <[email protected]>
gshemesh2
pushed a commit
to gshemesh2/sonic-mgmt
that referenced
this pull request
Dec 21, 2025
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Guy Shemesh <[email protected]>
venu-nexthop
pushed a commit
to venu-nexthop/sonic-mgmt
that referenced
this pull request
Jan 13, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
yifan-nexthop
pushed a commit
to nexthop-ai/sonic-mgmt
that referenced
this pull request
Jan 14, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: YiFan Wang <[email protected]>
gshemesh2
pushed a commit
to gshemesh2/sonic-mgmt
that referenced
this pull request
Jan 26, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Guy Shemesh <[email protected]>
lakshmi-nexthop
pushed a commit
to lakshmi-nexthop/sonic-mgmt
that referenced
this pull request
Jan 28, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Lakshmi Yarramaneni <[email protected]>
ytzur1
pushed a commit
to ytzur1/sonic-mgmt
that referenced
this pull request
Jan 29, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
ytzur1
pushed a commit
to ytzur1/sonic-mgmt
that referenced
this pull request
Feb 2, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Yael Tzur <[email protected]>
abhishek-nexthop
pushed a commit
to nexthop-ai/sonic-mgmt
that referenced
this pull request
Feb 6, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec
rraghav-cisco
pushed a commit
to rraghav-cisco/sonic-mgmt
that referenced
this pull request
Feb 13, 2026
…onic-net#20448) Summary: Fixes #23847 How did you verify/test it? RAn test generic_config_updater.test_eth_interface::test_replace_fec Signed-off-by: Raghavendran Ramanathan <[email protected]>
kazinator-arista
pushed a commit
to kazinator-arista/sonic-mgmt
that referenced
this pull request
Mar 4, 2026
…lly (sonic-net#20448) #### Why I did it src/sonic-gnmi ``` * 73069fa - (HEAD -> 202305, origin/202305) Increase dbus timeout for gcu (sonic-net#292) (15 hours ago) [ganglv] ``` #### How I did it #### How to verify it #### Description for the changelog
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Description of PR
Summary:
Fixes #23847
Type of change
Back port request
Approach
What is the motivation for this PR?
How did you do it?
How did you verify/test it?
RAn test generic_config_updater.test_eth_interface::test_replace_fec
Any platform specific information?
multi-asic
Supported testbed topology if it's a new test case?
Documentation