Skip to content

chore(deps): update actions/checkout action to v7 - #1496

Merged
Danathar merged 1 commit into
mainfrom
renovate/human-merge-paths-actions-checkout-7.x
Nov 24, 2026
Merged

Danathar merged 1 commit into
mainfrom
renovate/human-merge-paths-actions-checkout-7.x

Conversation

@mergeraptor

@mergeraptor mergeraptor Bot commented Nov 23, 2026 •

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Type Update Change
actions/checkout action major v5 → v7
actions/checkout action major v5.1.0 → v7.0.1

Release Notes

actions/checkout

v7.0.1

Compare Source

v7.0.0

Compare Source

  • Block checking out fork PR for pull_request_target and workflow_run by @​aiqiaoy in #​2454
  • Various dependency updates

v6.1.0

Compare Source

What's Changed

https://github.blog/changelog/2026-06-18-safer-pull_request_target-defaults-for-github-actions-checkout/ for more details about this breaking change

Full Changelog: actions/checkout@v6.0.3...v6.1.0

v6.0.3

Compare Source

v6.0.2

Compare Source

v6.0.1

Compare Source

v6.0.0

Compare Source


Configuration

📅 Schedule: (UTC)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about these updates again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate CLI.

@mergeraptor

mergeraptor Bot commented Nov 23, 2026 •

Copy link
Copy Markdown
Contributor Author

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
To complete the pull request process, please assign ahmedadan after the PR has been reviewed.
You can assign the PR to them by writing /assign @ahmedadan in a comment when ready.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@hivecommons-hive hivecommons-hive Bot added no-dco A commit is missing Signed-off-by — run `git rebase --signoff` stage/050-review-pending Review swarm requested; awaiting a verdict for the current head labels Nov 23, 2026
@hivecommons-hive

hivecommons-hive Bot commented Nov 23, 2026 •

Copy link
Copy Markdown
Contributor

Hive status — updated in place; edits do not notify. Full history is in the Activity Monitor.

ℹ️ Sentinel: informational, author is trusted (allow-listed bot), merge is not blocked. Head 69c0302d61c7 matched:

  • sensitive_path: changes 8 sensitive path(s) (.github/workflows/build.yml, .github/workflows/candidate-common.yml, .github/workflows/execute-release.yml, .github/workflows/image-baselines.yml, .github/workflows/pages.yml, +3 more)

No sentinel-alert label was added. The finding is recorded in the dashboard Security tab and /api/sentinel; set sentinel.trusted_authors_block: true to block trusted authors too.

Review findings from reviewer (folded here because this head already carries its hive review):

Summary: This update moves the project's automated build, test and release jobs to a newer version of GitHub's standard "download the code" step. I checked it and found nothing wrong with the change. One automated check is failing on this update, but that failure comes from a package conflict in an outside software repository, not from this change.


  • Pin is genuine. 3d3c42e5aac5ba805825da76410c181273ba90b1 is the commit that the upstream actions/checkout tags v7 and v7.0.1 both point to. I resolved both tags through the GitHub API.
  • The v7 fork-PR block does not apply here. None of the 8 changed workflows trigger on pull_request_target or workflow_run. The one workflow_run workflow (.github/workflows/rerun-e2e-infra-failures.yml:11) is not in this PR.
  • Partial bump is by design. 9 uses: lines in 6 other files still pin v5, for example .github/workflows/merge-queue.yml:34. The rule at renovate.json:79-94 sends the 11 human-merge workflows to their own branch, so this PR covers only those files. The rest will come in a separate update.
  • The red contract check is not caused by this PR. On this head, the step that runs the new Checkout succeeded, and so did Run unit suite. The failing step is Check package availability (just check-repos). It fails because qemu-system-x86-core from utah-packages needs libcbor.so.0.14, but public-hummingbird now ships libcbor-0.15.0. The fix belongs in the package factory, not here.
  • Not verified by CI (open question): the job that publishes the verification record pushes from a git worktree using the credentials checkout saved (.github/workflows/post-testing-e2e.yml:656-683). Checkout v6.0.0 moved those credentials to a separate file. v6.0.1 then added worktree support for that file, and v7.0.1 includes that fix, so the push should still work. That job runs only when dispatched on main, so watch its first run after this merges.

No findings from: correctness, security, intent-alignment, style, docs-currency.

@hivecommons-hive hivecommons-hive Bot added stage/070-fixing Hive-authored PR: CI red, changes requested or needs rebase; a hive agent is fixing it and removed stage/050-review-pending Review swarm requested; awaiting a verdict for the current head labels Nov 23, 2026

@hivecommons-hive hivecommons-hive Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

HUMAN DECISION NEEDED - approve merging a major-version upgrade of the code-checkout step used by the build, release and publish automation.

Summary: This automated update moves the tool that downloads this project's code inside its build, test and release automation from version 5 to version 7. I found nothing that breaks: the new version is pinned to the exact official release, and the one job that saves results back to the repository should keep working. The project's own update rules say a major upgrade to these sensitive automation files must be merged by a person, so a maintainer needs to sign off.

What I need from you: Approve and merge it, or close it.


security

  • Major uses: bump on 8 human-merge-path workflows. Some hold contents: write and the mergeraptor App secret. renovate.json:79 says majors on these files wait for a person. Pin verified: 3d3c42e5aac5ba805825da76410c181273ba90b1 equals both actions/checkout tags v7 and v7.0.1. v7 blocks fork-PR checkout under pull_request_target/workflow_run. None of the 8 changed files use those triggers, so they are unaffected. The only users are prow.yml and rerun-e2e-infra-failures.yml, which this PR does not touch.

Checked, no finding:

  • v6 moved persisted credentials into a separate includeIf file. Push from a git worktree (post-testing-e2e.yml:656 checkout; post-testing-e2e.yml:683 push) is still covered. The v7.0.1 src/git-auth-helper.ts:377-378 adds includeIf.gitdir:<gitDir>/worktrees/*.path.
  • The tests only check that uses: is a 40-hex pin, never a specific SHA (tests/test_merge_queue.py:145, tests/test_e2e_workflow_limits.py:19). So no test needs to change.
  • Eight other workflows (for example merge-queue.yml:34, image-installer.yml:96) stay on v5. That is expected: renovate.json:79 gives human-merge paths their own branch. Their update belongs in a separate PR.
  • CI at this head: contract fails at "Check package availability" because of an unrelated libcbor 0.14/0.15 package conflict (job 137793114141). Its Checkout step on v7 succeeded, and so did the unit suite.

No findings from: correctness, intent-alignment, style, docs-currency.

Confidence: 3/5 (needs attention) — 1 medium finding; 1 perspective requires a human decision

-- hive: agent=reviewer backend=claude model=claude-opus-5-5 effort=medium claude=2.1.327

@hivecommons-hive hivecommons-hive Bot added the stage/stalled In its current stage longer than expected label Nov 23, 2026
@mergeraptor
mergeraptor Bot force-pushed the renovate/human-merge-paths-actions-checkout-7.x branch from 69c0302 to 7c6cb43 Compare November 24, 2026 00:29
@hivecommons-hive hivecommons-hive Bot added stage/050-review-pending Review swarm requested; awaiting a verdict for the current head and removed stage/070-fixing Hive-authored PR: CI red, changes requested or needs rebase; a hive agent is fixing it stage/stalled In its current stage longer than expected labels Nov 24, 2026

@hivecommons-hive hivecommons-hive Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Decision needed: @castrojo should decide whether to owner-merge the actions/checkout v5 to v7 bump in the eight human-merge-path workflows, including the contents:write job in post-testing-e2e.yml.

Pins are correct and the bump looks safe for the files it touches. Routing to an owner because it changes third-party code in workflows that hold write tokens (needs-owner-merge already applied).

What I verified:

  • SHA matches tag. 3d3c42e5aac5ba805825da76410c181273ba90b1 is refs/tags/v7 and refs/tags/v7.0.1 on actions/checkout; old fbc6f399… is v5.1.0.
  • v7's fork-checkout block does not bite here. v7.0.0 blocks checking out fork PR heads under pull_request_target/workflow_run. Of the files in this diff, only prow.yml is in that trigger class, and it has no checkout step.
  • v6 credential change vs. the one writer. post-testing-e2e.yml (job at ~line 653, contents: write) checks out main with persisted creds and later runs git -C "$RUNNER_TEMP/record" push --force origin HEAD:refs/heads/verification from a git worktree. v6 moved persisted creds to a separate file loaded via includeIf; v6.0.1 added worktree support for exactly this. I expect it to work, but that step only runs on main, so this PR's CI cannot prove it. Worth watching the first post-merge Post-Testing E2E run.
  • Partial bump is intentional. merge-queue.yml, image-installer.yml, testing-freshness.yml, package-snapshot.yml and both rerun-*.yml stay on v5. They are outside the human-merge-paths- group in renovate.json:80-95, so a separate Renovate branch owns them. Note that rerun-e2e-infra-failures.yml and rerun-startup-failures.yml are workflow_run workflows: when their bump arrives, check they do not check out a fork head, or v7 will refuse it.
  • tests/test_merge_queue.py:145 only asserts a 40-hex pin form, so a mixed v5/v7 tree passes it.

Confidence: 3/5 (needs attention) — 1 medium finding; 1 perspective requires a human decision

-- hive: agent=reviewer-2 backend=claude model=claude-opus-5-5 effort=medium claude=2.1.327

@hivecommons-hive hivecommons-hive Bot added stage/060-reviewed Review swarm verdict approve; a gate is still pending (CI running, soak not started) and removed stage/050-review-pending Review swarm requested; awaiting a verdict for the current head labels Nov 24, 2026
@hivecommons-hive

Copy link
Copy Markdown
Contributor

Hive will not merge this PR: it changes path(s) listed in auto_merge.human_merge_paths for this repo, so a person must merge it.

  • .github/workflows/build.yml
  • .github/workflows/candidate-common.yml
  • .github/workflows/execute-release.yml
  • .github/workflows/image-baselines.yml
  • .github/workflows/pages.yml
  • .github/workflows/post-testing-e2e.yml
  • .github/workflows/promote-testing-to-main.yml
  • .github/workflows/update-gnome-extensions.yml

Hive added the needs-owner-merge label. It is not a hold: the hive's agents still fix, review and update this PR, and only a person merges it. A maintainer should review and merge this PR by hand.

@hivecommons-hive hivecommons-hive Bot added the stage/stalled In its current stage longer than expected label Nov 24, 2026
@Danathar
Danathar added this pull request to the merge queue Nov 24, 2026
@hivecommons-hive hivecommons-hive Bot added stage/090-ready-for-human-merge Hive would merge this but trust/role blocks it; a maintainer's /lgtm /approve is all that is missing and removed stage/060-reviewed Review swarm verdict approve; a gate is still pending (CI running, soak not started) stage/stalled In its current stage longer than expected labels Nov 24, 2026
@hivecommons-hive

Copy link
Copy Markdown
Contributor

Ready for a human merge: verdict approved @7c6cb43, 21/21 checks green, soak 30m0s elapsed. Breaking change — owner merges.

The hive never merges this lane's changes itself: click Merge to land it.

Merged via the queue into main with commit 03b19f3 Nov 24, 2026
61 checks passed
@Danathar
Danathar deleted the renovate/human-merge-paths-actions-checkout-7.x branch November 24, 2026 01:47
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

hive-review needs-owner-merge no-dco A commit is missing Signed-off-by — run `git rebase --signoff` stage/090-ready-for-human-merge Hive would merge this but trust/role blocks it; a maintainer's /lgtm /approve is all that is missing

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant