Skip to content

chore(deps): update rust crate zvariant to 5.11.0#395

Merged
cachebag merged 1 commit intomasterfrom
renovate/zvariant-5.x
May 7, 2026
Merged

chore(deps): update rust crate zvariant to 5.11.0#395
cachebag merged 1 commit intomasterfrom
renovate/zvariant-5.x

Conversation

@renovate
Copy link
Copy Markdown
Contributor

@renovate renovate Bot commented May 7, 2026

This PR contains the following updates:

Package Type Update Change
zvariant workspace.dependencies minor 5.10.15.11.0

Release Notes

z-galaxy/zbus (zvariant)

v5.11.0: 🔖 zbus 5.11.0

Compare Source

  • ✨ API to specify timeouts for method calls. Add a way to specify an timeout for method calls. If
    set, the method calls will timeout after the specified duration, returning an error. This can be
    used to handle the issues with non-answering D-Bus services.
  • 🩹 Add connection::socket::Split::new method, allowing Socket trait impls outside zbus.
  • 📝 Mention receive_X_changes in proxy docs.

Configuration

📅 Schedule: (UTC)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@cachebag cachebag merged commit 0e24dc3 into master May 7, 2026
6 checks passed
@cachebag cachebag deleted the renovate/zvariant-5.x branch May 7, 2026 02:36
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant