Fixed Costs #153

@BenWinchester

Description

@BenWinchester

Issue

Currently, all costs within CLOVER are tied to components. Whether this is directly, e.g., the cost of installing a specific component, or whether this is indirectly, e.g., the misc costs within the finance_inputs.yaml which are scaled with the capacity of (number of) PV collectors installed. There is no way currently to include some static costs.

Importance and relevance

Static costs crop up throughout energy-system modelling:

  • The land/area needed for installing a system may come as a pre-purchased amount, which doesn't scale with the size of the system, but the cost of which needs to be included in $lcue$ and $total$ $cost$ calculations;
  • Installation costs which are fixed, e.g., construction of the setup or delivery of large components which potentially necessitate some fixed cost. E.G., a van for delivering 10 solar panels is likely the same as that for 1 solar panel, so the cost should scale accordingly.

Proposal

A fixed misc cost should be included in the finance_inputs.yaml file:

misc:
  capacity_cost: 0  # [$/kWp]
  fixed_cost: 0  # [$]

where the fixed_cost is added at the start of the simulation/optimisation period, and the capacity_cost scales with the capacity as per the old cost variable:

misc:
- cost: 0 # [$]
+ capacity_cost: 0  # [$/kW]
+ fixed_cost: 0  # [$]

Alternatives include:

  • A "hacky" solution, whereby these costs are included as household costs, or as some tweak to the installation costs;
  • Not including these costs.

Metadata

Metadata

Labels

enhancementNew feature or request

Type

No type

Projects

Status

Done

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions