build(deps-dev): update boto3-stubs requirement from ~=1.42.13 to ~=1.43.3 #535
continuous-integration.yml
on: pull_request
Matrix: Lint and test
Minimum dependencies
35s
Annotations
7 errors
|
Lint and test (3.11)
Process completed with exit code 1.
|
|
Lint and test (3.10)
The strategy configuration was canceled because "standard-lint-test._3_11" failed
|
|
Lint and test (3.10)
Process completed with exit code 1.
|
|
Lint and test (3.12)
The strategy configuration was canceled because "standard-lint-test._3_11" failed
|
|
Lint and test (3.12)
Process completed with exit code 1.
|
|
Lint and test (3.13)
The strategy configuration was canceled because "standard-lint-test._3_11" failed
|
|
Lint and test (3.13)
A task was canceled.
|