Grid Extension Cost #172
BenWinchester
started this conversation in
IAA
Replies: 1 comment
-
General thoughts@hamishbeath , I think that this is something that it would still be nice to have. CLOVER could, run an optimisation, and, as part of it, run a simulation with a grid being connected and the cost of grid extension included. This might be overlapping with the GIS work, but it might be nice if, at the end of an optimisation, a user was informed: "The best system would be 5 kWp of PV, 2 kWh of storage, with an LCUE of 1.00 |
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
-
Issue
The electric grid (and potentially mains-water, gas/hydrogen etc.) is included if the user specifies that the community has a grid connection, but there is no provision for a cost of extending the grid to the community as a potential alternative to relying solely on minigrid-only supply. Including this functionality is mentioned within Version 1 of the User Guide for CLOVER 4.
Proposal
Including a grid-extension cost would be an enhancement to CLOVER.
Beta Was this translation helpful? Give feedback.
All reactions